Laserfiche WebLink
reference (the "Delivery Schedule "). Aurora will commence supplying the Reclaimed <br />Wastewater on July 1, 2011 and cease supplying the Reclaimed Wastewater on December 31, <br />2015. <br />2. Delivery Schedule. Delivery of the Reclaimed Wastewater will be made in accordance <br />with the Delivery Schedule set forth in Exhibit A. No later than October 31 of each year, Lessee <br />may submit to Aurora a proposed modified Delivery Schedule (a "Modified Schedule "), setting <br />forth revised monthly delivery totals for the upcoming Lease Year, as that term is defined in <br />paragraph 8 below. Any proposed Modified Schedule shall be effective only upon Aurora's <br />written consent, and upon Aurora's acceptance of any Modified Schedule, such Modified <br />Schedule shall be the Delivery Schedule for the upcoming Lease Year. In no event shall the total <br />amount of Reclaimed Wastewater delivered exceed the maximum amounts set forth in the <br />Delivery Schedule or Modified Schedule. As long as Aurora is capable of delivering the <br />Reclaimed Wastewater to the delivery points according to the Delivery Schedule or Modified <br />Schedule, Lessee will be obligated to pay the per -acre foot charge set forth in Paragraph 7 herein <br />below regardless of whether or not Lessee requests or uses the Reclaimed Wastewater. <br />3. Delivery Location. <br />(a) Delivery Points. Lessee agrees that Aurora shall initially make its delivery of the <br />Reclaimed Wastewater at the outfall of the Metro Wastewater Reclamation District treatment <br />facility located on the South Platte River ( "Metro "). Lessee further agrees that Aurora may, in its <br />sole discretion, satisfy its delivery obligations under this Agreement by delivering the Reclaimed <br />Wastewater at any other delivery point or delivery points on the South Platte River (each of <br />Metro and such other delivery points, hereinafter, a "Delivery Point" and collectively, the <br />"Delivery Points "); provided that such alternative delivery points are located within a reach of <br />the South Platte River beginning at or below Metro and continuing downstream to a point at or <br />above the location where the South Platte River crosses the center of the southeast quarter of <br />Section 34, Township 1 South, Range 67 West of the 6 P.M. (such location, the "Point of Use "). <br />Lessee acknowledges and agrees that the alternate Delivery Points may include, but are not <br />limited to, other wastewater treatment plants that may be constructed in the future which <br />discharge Reclaimed Wastewater owned by Aurora, the Brighton Ditch Augmentation Stations, <br />the outfall of Walker Reservoir, and the confluence of Sand Creek and the South Platte River. <br />Aurora will bear the responsibility for delivery of the Reclaimed Wastewater to these Delivery <br />Points, and in its sole discretion may determine which of the Delivery Points it will use at any <br />given time. Once Aurora has completed its delivery of the Reclaimed Wastewater hereunder, <br />Lessee shall assume sole liability for any loss, damage, or injury that may occur to persons or <br />property as the direct or indirect result of the control and/or use of said Reclaimed Wastewater <br />by Lessee. The amount of Reclaimed Wastewater needed at the delivery points was calculated <br />by Lessee to include any transportation losses, or "shrinkage," from the delivery points to <br />Lessee's point of use downstream. Lessee also acknowledges the travel time between the <br />alternate Delivery Points and Lessee's Point of Use varies, but that the timing for Aurora's <br />delivery obligations as provided for under the Delivery Schedule shall remain the same <br />regardless of Aurora's use of alternative Delivery Points. <br />(b) Credit for Avoided Transit Loss. Aurora's obligations with respect to the volume <br />of Reclaimed Wastewater to be delivered under this Agreement are deemed to be satisfied if <br />9411\310 \1539008.1 <br />2 <br />