My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-11-14_INSPECTION - C1996084
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1996084
>
2012-11-14_INSPECTION - C1996084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:10:33 PM
Creation date
12/13/2012 1:12:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Inspection
Doc Date
11/14/2012
Doc Name
Inspection Report
From
DRMS
To
Ron Thompson
Inspection Date
11/14/2012
Email Name
DIH
LDS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 14, 2012 C- 1996- 084 /Lorencito Canyon Mine DIH <br />Inspection Topic Summary <br />NOTE: Y= Inspected N =Not Inspected R= Comments Noted V= Violation Issued NA =Not Applicable <br />N - Air Resource Protection <br />N - Roads <br />N - Availability of Records <br />N - Reclamation Success <br />N - Backfill & Grading <br />R - Revegetation <br />N - Excess Spoil and Dev. Waste <br />N - Subsidence <br />N - Explosives <br />N - Slides and Other Damage <br />N - Fish & Wildlife <br />N - Support Facilities On -site <br />R - Hydrologic Balance <br />N - Signs and Markers <br />N - Gen. Compliance With Mine Plan <br />N - Support Facilities Not On -site <br />N - Other <br />N - Special Categories Of Mining <br />N - Processing Waste <br />N - Topsoil <br />COMMENTS <br />This was a Coal Partial inspection conducted by Dan Hernandez. Bobby Steele, a company representative, was <br />present during the inspection. The weather was cool, clear, sunny and dry. According to Division inspection <br />reports, backfilling and grading of the mine area was completed in the fall of 2003, with re- topsoiling occurring <br />during the fall and winter of 2004, and re- seeding occurring during the spring of 2004. Due to the company <br />representative's vehicle getting high- centered on a water bar late in the day, this inspection had to be cut short. <br />HYDROLOGIC BALANCE - Rule 4.05 <br />Drainage Control 4.05.1, 4.05.2, 4.05.3; Siltation Structures 4.05.5, 4.05.6; Discharge Structures 4.05.7, 4.05.10; <br />Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring 4.05.13; <br />Drainage — Acid and Toxic Materials 4.05.8; Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br />Pond 8 was inspected, though no photos were taken. Pond 8 was dry at the time of the inspection. Pond 8's <br />primary and secondary spillway were in compliance. <br />Number of Partial Inspection this Fiscal Year: 4 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.