Laserfiche WebLink
SL # <br />Phase 1 Area <br />Phase 2 Area <br />1 <br />226.4 <br />176.4 <br />2 <br />712.1 <br />3 <br />762.1 <br />4 <br />494.2 <br />420.9 <br />Total <br />1,432.7 <br />1,359.4 <br />COAL <br />COMPANY 4 <br />., ��s.raonvc+KO� • <br />2. The disturbed and affected area listed on page 3 of your RN -06 application <br />is 4,800.6 acres, but it should be less to reflect the reduction in acreage <br />from SL -05. The amount of area released with SL -05 was 979.5 acres. The <br />result of 4,800.6 less 979.5 is 3,821.1 acres. However, the number in our <br />Permit System is 3,786 acres. (I do realize that the RN -06 application was <br />submitted before SL -05 was approved, however I think it makes sense to <br />address this now, especially given the discrepancy between 3,821 acres and <br />3,786 acres.) <br />Response: Colowyo removed the SL -05 released acres (979.5) from the <br />disturbed and affected acres as requested. Per a phone conversation on <br />November 30, 2012 between Mr. Rob Zuber and Mr. Tony Tennyson, the <br />total acres disturbed were discussed. Mr. Tennyson stated that after <br />revisiting the disturbed acres, that Colowyo believes the number in the <br />Division permit system is correct. Therefore, Colowyo is updating page 3 <br />of the renewal and re- submitting it under this cover. <br />3. The bond release areas on page 3 of the RN -06 application (approximately <br />1,415 ac for 60% and approximately 1,341 ac for 85 %) are approximately <br />18 acres less than what we have in our Permit System. Our Permit System <br />numbers are consistent with the sum of Phase I and Phase II released areas <br />from SL1 - SL4 (as listed in the DRMS findings, see table below). <br />Response: Per a phone conversation between Mr. Rob Zuber and Mr. <br />Tony Tennyson on December 10, 2012, 1:38 P.M it was requested by the <br />A Western Fuels - Colorado, LIE mining property <br />