Laserfiche WebLink
3. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re- establishment of <br />vegetation. Specify approximate topsoil re distribution depth: <br />See attached <br />4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />See attached <br />5. Describe how portals, edits, shafts, ponds, excavations, or other disturbances wi11 be reclaimed (refer to Rule 3 and Rule 5 for <br />specific) reclamation performance standards). You may wish to contact the Division for closure specifications. <br />See attached <br />6 (Form 2- Public) <br />6. Describe hew roads will be reclaimed or returned to their pre - prospecting (or better) condition: <br />She of shed <br />