Laserfiche WebLink
SWB -3 Peak Discharge 100YR 14N0V12.txt <br />Graphical Peak Discharge wed Nov 14 16:45:44 2012 <br />Project: SWB -3 By: B Langenfeld Date: 11/14/12 <br />Location: Revenue Mine Checked: Date: <br />Developed <br />1. Data: <br />Drainage area A = 18.8100Acres <br />Runoff Curve Number CN = 79 <br />Time of Concentration Tc = 0.19 <br />Storm Type = II <br />Pond and swamp areas spread <br />throughout watershed = 0.00 percent of A <br />0.0000 Acres <br />2. Frequency yr = 100 <br />3. Rainfall,P(24 -hour) in = 3.20 <br />4. Initial abstraction, Ia = 0.5316 <br />5. Compute Ia /P = 0.1661 <br />6. unit peak discharge, qu csm /in = 782.95 <br />7. Runoff,Q in = 1.3367 <br />8. Pond & swap adjustment factor, Fp = 1.00 <br />9. Peak Discharge,qp cfs = 30.7598 <br />Page 1 <br />