Laserfiche WebLink
Table 13 <br /> Sediment Control Structures Dimensions <br /> Pond No. <br /> 003 004 <br /> Elevation of Upstream Toe (Ft) 7,109.5 7,067.5 <br /> Elevation of 3-Yr. Sediment Volume (Ft) 7,111.1 7,070.0 <br /> Elevation of Principal Spillway (Ft) 7,113.4 7,071.8 <br /> Elevation of Emergency Spillway (Ft) 7,115.0 7,073.5 <br /> Elevation of Top of Structure (Ft) 7,117.0 7,075.5 <br /> Elevation of Crest of Emergency Spillway (Ft) 7,115.99 7,074.09 <br /> Freeboard (Ft) 1.01 1.41 <br /> Width - Top of Structure (Ft) 12.0 15.0 <br /> Upstream Slope of Embankment 1V:2H 1V:2.6H <br /> Downstream Slope of Embankment 1V:3.5H 1V:3.4H <br /> Note: Calculations shown in Exhibit 16, Surface Water Control Design Data. <br /> 2.05-18 <br />