Laserfiche WebLink
Revised 11/15/81 <br /> 2.03.8 Permit Term Information <br /> The Maxwell Mine began production in March of 1977. Actual construction <br /> of the mine facility was begun in February of 1976. The Maxwell Mine is <br /> expected to continue operation for approximately 40 years, or through <br /> 2020. During the next five year term of the permit, approximately 300 <br /> acres will be affected by underground mining. During the life of the <br /> mine, approximately 6,500 acres will be affected by underground mining <br /> methods. Surface facilities for the underground operations have <br /> disturbed approximately 51.50 acres in 1976 and 1977. CF&I Steel <br /> Corporation does not anticipate any additional disturbance other than <br /> that required for disposal of coal processing waste material . Areas <br /> which will be affected for mining and reclamation during the permit term <br /> and the life of the mine are shown in Table 4, Affected Areas for Mining <br /> and Reclamation. The horizontal extent of the proposed underground mine <br /> workings for the permit term and the life of the mine are shown on the <br /> Mine Plan Map (Map 3) . Underground operations at the Maxwell Mine will <br /> be in the Maxwell Seam. The location of the Maxwell Seam with respect <br /> to the other coal seams and surface are shown in Figure 1, Typical <br /> Stratigraphic Section. <br /> 2.03.9 Personal Injury and Property Damage Insurance Information <br /> CF&I Steel Corporation, through Crane Company, maintains personal injury <br /> and property damage insurance. A copy of the insurance policies <br /> covering the Maxwell Mine is shown in Exhibit 1, Certificate of <br /> Insurance. <br /> 2.03.10 Identification of Other Licenses and Permits <br /> Numerous licenses and permits have been obtained for the continued <br /> operation of the Maxwell Mine. Table 5, Other Licenses and Permits, <br /> shows the listing of permits which CF&I Steel Corporation has obtained <br /> during the past five years to permit operation of the Maxwell Mine. <br /> 2.03-19 <br />