Laserfiche WebLink
Table of Contents - Continued. <br /> TITLE PAGE <br /> RULE 2.06 REQUIREMENTS FOR PERMITS FOR SPECIAL <br /> CATEGORIES OF MINING <br /> 2.06.1 Scope 2.06-1 <br /> 2.06.2 Experimental Practices Mining 2.06-1 <br /> 2.06.3 Mountaintop Removal Mining 2.06-1 <br /> 2.06.4 Steep Slope Mining 2.06-1 <br /> 2.06.5 Permits Incorporating Variances from <br /> Approximate Original Contour Restoration <br /> Requirements for Steep Slope Mining 2.06-1 <br /> 2.06.6 Prime Farmlands 2.06-1 <br /> 2.06.7 Variances for Delay in Contemporaneous <br /> Reclamation Requirements in Combined <br /> Surface and Underground Mining <br /> Operation 2.06-2 <br /> 2.06.8 Surface Coal Mining and Reclamation <br /> Operations on Alluvial Valley Floors 2.06-2 <br /> 2.06.9 Augering 2.06-4 <br /> 2.06.10 Coal Processing Plants and Support Facilities <br /> Not Located Within the Permit Area 2.06-4 <br /> 2.06.11 In Situ Processing Activities 2.06-4 <br /> iii <br />