Laserfiche WebLink
ASPHALT <br />SPECIALTIES CO. <br />10100 Dallas St. • Henderson, CO 80640 <br />December 7, 2012 <br />M <br />/ <br />r. Eric Scott <br />Environmental Protection Specialist <br />Colorado Div. of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />RE: Responses to Second Adequacy Review for Amendment (AM -2), Turnpike Mining <br />Resource, DRMS Permit No. M- 2004 -009 <br />Dear Mr. Scott: <br />Enclosed are: <br />(303) 289 -8555 • Fax: (303) 289 -7707 <br />/ <br />RECEIVED <br />C 10 2012 <br />DIVISION OF RECLAMATION v <br />MINING AND SAWN <br />We (ASCl/Weiland, Inc.) are submitting our responses and information to you regarding <br />your second adequacy review comments received by us via e-mail on October 17, 2012. <br />We have asked for and you have approved three extension requests in order to for us to <br />properly answer primarily your concerns with groundwater issues on the referenced <br />permit site. <br />1. Revised map Exhibits C -2 and F, the mine and reclamation plan maps. <br />The only change on the mine plan maps are additional utilities and revised <br />locations all enclosed within the easement for the Erie /ASCI utilities on <br />the east side of the entrance road. Since the utilities are all contained <br />within an easement, there is no change to the mining limits with this <br />update. After further review of the backfilling of the "trout pond" in the <br />northwest corner of the permit area that is a reclaimed feature of the old <br />DMG permit on this site, we have realized that there is not enough backfill <br />material (shale, overburden) to fill this pond at this time. It is all accounted <br />for in the current mass balance figuring for the reclamation of the current <br />mining activities. As stated before, the augmentation for this pond will be <br />accounted for in the revised SWSP plan that will be renewed upon <br />approval of this amendment. ASCI does own ditch shares in the Boulder - <br />White Rock Ditch that serves this property and will use those shares as <br />part of a permanent augmentation plan for this pond. Since we are not <br />backfilling the trout pond, there is no revision to Exhibit L with his <br />adequacy submittal. The revised Exhibit L submitted on October 18, 2012 <br />is still valid. <br />2. Structure Agreement letters and attachments (agreement and map) for the <br />three remaining structure owners within 200 ft. of the mining limits of this <br />site in the southernmost area of the permit (previously sent by e -mail to <br />you). Until such a time that these agreement letters are signed by the <br />