My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-06_REVISION - M2011013
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2011013
>
2012-12-06_REVISION - M2011013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:38:21 PM
Creation date
12/11/2012 7:47:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2011013
IBM Index Class Name
REVISION
Doc Date
12/6/2012
Doc Name
Request for Bond Reduction
From
Telluride Stone Co.
To
DRMS
Type & Sequence
SR1
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cycle Time Factors <br />Factor (min.) <br />Source <br />Material: <br />Bank or broken material 0.04 <br />0.040 <br />(Cat HB) <br />Stockpile: <br />Conveyor or dozer piled 10 ft. high or less 0.01 <br />0.010 <br />(Cat HB) <br />Truck Ownership: <br />No adjustment - factor not applicable 0.00 <br />0.000 <br />(Cat HB) <br />-0.040 <br />(Cat HB) <br />Operation: <br />Constant operation -0.04 <br />Dump Target: <br />Nominal target 0.00 <br />0.000 <br />A 010 <br />(Cat HB) <br />minntec <br />Task description: <br />Site: Airport Pit <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />Haul and Return Time <br />Haul Route: <br />Return Route: <br />WHEEL LOADER - LOAD AND CARRY WORK <br />Carry backfill material to pit <br />Permit Action: TR - 1 Permit/Job #: M2011013 <br />PROJECT IDENTIFICATION <br />Task #: 002 State: Colorado <br />Date: 7/18/2012 County: San Miguel <br />User: RCO <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 938H Horsepower: 172 <br />Attachment 1: ROPS Cab Shift Basis: 1 per day <br />Data Source: (CRG) <br />Total Fleet Cost/Hour: $97.90 <br />MATERIAL QUANTITIES <br />Initial volume: 32,268 CCY Swell factor: 1.000 <br />Loose volume: 32,268 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Loader Cvcle Time: Unadjusted Basic Cycle Time (load, dump, maneuver): 0.483 minutes <br />Rolling Resistance — Road Conditions <br />Haul: Rutted dirt, little maintenance, no water, 1" tire penetration 4.0 <br />Return: Rutted dirt, little maintenance, no water, 1" tire penetration 4.0 <br />400 <br />400 <br />5.00 <br />-5.00 <br />4.00 <br />4.00 <br />9.00 <br />-1.00 <br />0.4811 <br />0.2687 <br />Length <br />(feet) <br />$22.07 <br />$37.34 <br />$38.49 <br />$97.90 <br />Grade Res. <br />( %) <br />Utilization % <br />NA <br />100 <br />NA <br />Abbreviation: None <br />Filename: M013 -002 <br />let Cycle Tune Adjustment: <br />Adjusted Basic Cycle Time: 0.493 <br />Rolling <br />Res. ( %) <br />Total Res. <br />( %) <br />Travel Time <br />(minutes) <br />Page 1 of 2 <br />minutes <br />Source <br />(Cat HB) <br />(Cat HB) <br />CIRCES Cost Estimating So t �f aid <br />
The URL can be used to link to this page
Your browser does not support the video tag.