My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-06_REVISION - M2011013
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2011013
>
2012-12-06_REVISION - M2011013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:38:21 PM
Creation date
12/11/2012 7:47:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2011013
IBM Index Class Name
REVISION
Doc Date
12/6/2012
Doc Name
Request for Bond Reduction
From
Telluride Stone Co.
To
DRMS
Type & Sequence
SR1
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost summa <br />Task description: <br />Site: Airport Pit <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />000 <br />7/18/20 <br />RCO <br />Agency or organization name: <br />TASK LIST (DIRECT COSTS <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />Performance bond: <br />Job superintendent: <br />Profit: <br />COST SUMMARY WORK <br />State: Col orado <br />County: San Mi el <br />2.02 <br />1.05 <br />30.40 <br />10.00 <br />Permit Action: TR -1 <br />DRMS <br />CONTINGENCY: 0.00 <br />Permit/Job #: M2 0 1 1013 <br />Abbreviation: None <br />Filename: M013-000 <br />001 <br />002 <br />003 <br />004 <br />005 <br />006 <br />007 <br />008 <br />009 <br />010 <br />Descri • tion <br />Onsite dis • osal of debris <br />C , backfill material to • it <br />Grade and com • act waste rock in • it <br />C. to • soil to • it <br />Spread topsoil cover on backfilled pit and <br />disturbed area <br />Grade stock•ile and •rocess area <br />Grade to • soil stora_e area <br />Ri• com action in stoc •ile and •rocess area <br />Reve ! etate disturbed areas <br />Haul reclamation e • ui • ment to and from site <br />Form <br />Used <br />DEMOLISH <br />LOADER <br />DOZER <br />LOADER <br />DOZER <br />DOZER <br />DOZER <br />RIPPER <br />REVEGE <br />MOBILIZE <br />Fleet <br />Size <br />SUBTOTALS: <br />Task <br />Hours <br />2.00 <br />187.63 <br />55.34 <br />9.22 <br />2.44 <br />4.03 <br />1.34 <br />4.44 <br />32.00 <br />6.00 <br />304.44 <br />Cost <br />Total = <br />Total = <br />Total = <br />Total = <br />TOTAL O &P= <br />CONTRACT AMOUNT (direct + O & P) = <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 0.00 <br />Engineering work and/or contract/bid preparation: 0.00 <br />Reclamation management and/or administration: 5.00 <br />Total = <br />Total = <br />Total <br />TOTAL INDIRECT COST = <br />$34.01 <br />$18,370. <br />$11,791.1 <br />$903.00 <br />$504.58 <br />$831.61 <br />$286.03 <br />$947.00 <br />$10,834.9 <br />$3,694.26 <br />$ $48,1963 <br />$973.57 <br />$506.06 <br />$1,802.72 <br />$4,819.65 <br />$8,102.00 <br />$56,298.54 <br />0.00 <br />$0.00 <br />$2,814.93 <br />$0.00 <br />$10,916.93 <br />TOTAL BOND AMOUNT (direct + indirect) = $59,113.47 <br />a d-f.2o <br />
The URL can be used to link to this page
Your browser does not support the video tag.