8 Rip compaction in stockpile and process area RIPPER 1 4.44 $947.00 4.44 $947.00 <br />Explanation: No reduction required. <br />9 Revegetate disturbed area REVEGE 1 32.00 $10,834.90 24.00 $7,983.61 <br />Explanation: The original cost of this task was based on 9.5 acres x Cost /acre = $877.32. <br />The revised cost is based on 7 acres x $877.32 cost /acre = $6,141.24 plus an adjusted 30% failure rate of $1,842.37 equals $7,983.61. <br />10 Haul reclamation equipment to and from site MOBILIZE 1 6.00 $3,694.26 6.00 $3,694.26 <br />Explanation: No reduction required. The same equipment will be mobilized and the haul distance and time remains the same. <br />SUBTOTALS: <br />INDIRECT COSTS <br />OVERHEAD & PROFIT <br />Liability insurance: <br />Performance bond: <br />Job superintendent: <br />Explanation: The duration of the project will be reduced. <br />2.02 <br />1.05 <br />30.4 <br />Profit (10 %): 10 $4,819.65 <br />TOTAL 0 & P: $8,102.00 <br />CONTRACT AMOUNT (direct + 0 & P) $56,298.54 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT <br />Financial warranty processing (legal /related): 0 $0.00 <br />Engineering work and /or contract /bid preparation: 0 $0.00 <br />Reclamation managementand /or administration: 5.0 $2,814.93 <br />Contingency: 0 $0.00 <br />TOTAL INDIRECT COST $10,916.93 <br />TOTAL BOND AMOUNT (direct + indirect) $59,113.47 <br />304.44 $48,196.54 137.12 $25,415.41 <br />$973.57 <br />$506.06 <br />$1,802.72 <br />2.02 <br />1.05 <br />14.5 <br />$973.57 <br />$506.06 <br />$859.85 <br />10 $2,541.54 <br />$4,881.02 <br />$30,296.43 <br />5.0 $2,814.93 <br />$7,695.95 <br />$33,111.36 <br />