My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-06_REVISION - M2011013
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2011013
>
2012-12-06_REVISION - M2011013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:38:21 PM
Creation date
12/11/2012 7:47:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2011013
IBM Index Class Name
REVISION
Doc Date
12/6/2012
Doc Name
Request for Bond Reduction
From
Telluride Stone Co.
To
DRMS
Type & Sequence
SR1
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br />Task description: Rip compaction in stockpile and process area <br />Site: Airport Pit Permit Action: TR - I <br />PROJECT IDENTIFICATION <br />Task #: 008 State: Colorado <br />Date: 7/18/2012 County: San Miguel <br />User: RCO <br />Area: <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT COST <br />Basic Machine: <br />Ripper Attachment: <br />Cost Breakdown: <br />Cat D8T - 8SU <br />3 -Shank Ripper <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />$65.28 <br />$102.81 <br />$6.49 <br />$38.49 <br />$213.07 <br />Source of estimated quantity: Original application and TR -1 <br />HOURLY PRODUCTION <br />Seismic: <br />Horsepower: 310 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Utilization % <br />NA <br />100 <br />100 <br />NA <br />Total Fleet Cost/Hour: $213.07 <br />MATERIAL QUANTITIES Selected estimating method: Area <br />Alternate Methods: <br />Seismic: NA Bank Volume: NA BCY NA <br />Area: 3.00 acres Rip Depth (ft): 1.00 Volume: 4,840 BCY or CCY <br />Seismic Velocity: NA feet/second <br />Average Ripping Depth: 2.56 mph <br />Average Ripping Width: 7.08 degrees <br />Average Ripping Length: 400.00 feet <br />Average Dozer Speed: 88.00 feet <br />Average Maneuver Time: 0.25 feet <br />Production per unit area: 0.813 acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: 0.813 Acres/hr <br />Site Altitude: 9,100 feet <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.83 multiplier <br />Permit/Job #: M2011013 <br />Abbreviation: None <br />Filename: M013 -008 <br />Adjusted Hourly Unit Production: 0.68 Acres/hr <br />Adjusted Hourly Fleet Production: 0.68 Acres/hr <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) Total job time: 4.44 Hours <br />Unit cost: $315.586 Per acre <br />Total job cost: $947.00 <br />CIRCES Cost Estimating Software <br />/4 Of ..20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.