My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-06_REVISION - M2011013
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2011013
>
2012-12-06_REVISION - M2011013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:38:21 PM
Creation date
12/11/2012 7:47:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2011013
IBM Index Class Name
REVISION
Doc Date
12/6/2012
Doc Name
Request for Bond Reduction
From
Telluride Stone Co.
To
DRMS
Type & Sequence
SR1
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Airport Pit <br />PROJECT IDENTIFICATION <br />Task #: 007 State: Colorado Abbreviation: None <br />Date: 7/18/2012 County: San Miguel Filename: M013 -007 <br />User: RCO <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D8T - 8SU <br />Horsepower: 310 <br />Blade Type: Semi - Universal <br />Attachment: 3 -shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />$213.07 <br />$213.07 <br />MATERIAL QUANTITIES <br />Initial Volume: 807 <br />Swell factor: 1.000 <br />Loose volume: 807 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />$65.28 <br />$102.81 <br />$6.49 <br />$38.49 <br />50 feet <br />1,400.0 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: 0 % <br />Average site altitude: 9,100 feet <br />Material weight: 2,1001bs/LCY <br />Weight description: Earth - Loam <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />BULLDOZER WORK <br />Grade topsoil storage area <br />Permit Action: TR -1 Permit/Job #: M2011013 <br />0.750 <br />0.900 <br />1.000 <br />Utilization % <br />NA <br />100 <br />100 <br />NA <br />Source <br />(AVG.) <br />(CAT HB)) <br />(GEN.) <br />Page 1 of 2 <br />CIRCES Cost Estimating Software <br />Af of .)6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.