Laserfiche WebLink
1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT /DAY) <br />0.700 <br />(FND -MF) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.902 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Bulldozer Worksheet Cont'd <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Net correction: 0.4717 <br />Adjusted unit production: 660.38 LCY/hr <br />Adjusted fleet production: 660.38 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.313 /LCY <br />Total job time: 2.44 Hours <br />Total job cost: $504.58 <br />Task # 005 <br />Note: This task includes topsoil replacement on 2.0 acres. <br />Page 2 of 2 <br />CIRCES Cost Estimating Software <br />7/ Of 0)6 <br />