Laserfiche WebLink
Task description: <br />Site: Airport Pit <br />PROJECT IDENTIFICATION <br />Task #: 003 <br />Date: 7/18/2012 <br />User: RCO <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D8T - 8SU <br />Horsepower: 310 <br />Blade Type: Semi - Universal <br />Attachment: 3 -shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: $213.07 <br />Total Fleet Cost/Hour: $213.07 <br />MATERIAL QUANTITIES <br />Initial Volume: 32,268 <br />Swell factor: 1.000 <br />Loose volume: 32,268 LCY <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Average push gradient: <br />Average site altitude: <br />Grade and compact waste rock in pit <br />Permit Action: TR -1 Permit/Job #: M2011013 <br />0% <br />9,100 feet <br />State: Colorado Abbreviation: None <br />County: San Miguel Filename: MO13 -003 <br />$65.28 <br />$102.81 <br />$6.49 <br />$38.49 <br />50 feet <br />1,400.0 LCY/hr <br />BULLDOZER WORK <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Materials consistency description: Loose stockpile 1.2 <br />Material weight: 3,300 lbs /LCY <br />Weight description: Decomposed rock - 75% Rock, 25% Earth <br />Job Condition Correction Factor <br />Operator Skill: 0.750 <br />Material consistency: 1.200 <br />Dozing method: 1.000 <br />Utilization °A. <br />NA <br />100 <br />100 <br />NA <br />Source <br />(AVG.) <br />(CAT HB) <br />(GEN.) <br />Page 1 of 2 <br />CIRCES Cost Estimating Software <br />4 0f .10 <br />