Laserfiche WebLink
MAXWELL MINE <br /> File No. C-013-81 <br /> Response to Draft Findings Document <br /> XI . Soils - Rules 2 .04 .9 , 2 .053(5) , 2 .05 .4(2) (d ) and 4 .06 <br /> Topsoil Identification Stipulation - CF8-I has marked the <br /> subsoil and topsoil piles in the field as required by <br /> regulation. CF&I requests that this stipulation be removed. <br /> Redistribution of Topsoil Plan - The Plan calls for <br /> replacement of subsoil and topsoil on the coal waste banks. <br /> Remaining subsoil and topsoil will be replaced on areas that <br /> could best be reclaimed by the addition of soil materials. <br /> Those areas are not known at this time , as final reclamation <br /> is many years in the future. CMI requests that this <br /> stipulation be removed . <br /> Additional Soil Testing Stipulation - Because it is not known <br /> at this time which areas will be reclaimed without the <br /> replacement of soil materials, CF&.I believes this <br /> stipulation is premature. <br /> DWZ/as <br /> 8-1 1 -82 <br /> MEpLKd <br />