My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-06_REVISION - C1981008 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2012-12-06_REVISION - C1981008 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:12 PM
Creation date
12/10/2012 8:34:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
REVISION
Doc Date
12/6/2012
Doc Name
Bond Release Request (Part 1 of 2)
From
Western Fuels Colorado
To
DRMS
Type & Sequence
SL14
Email Name
MLT
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
23 -39 <br />TS58 <br />3.0 <br />36 <br />23 -39 <br />TS62 <br />3.1 <br />37 <br />23 -39 <br />TS63 <br />3.6 <br />43 <br />Average <br />3.4 <br />41 <br />Phase II Area 2 <br />37 -49 <br />TS49 <br />3.3 <br />40 <br />37 -49 <br />TS48 +150N <br />2.9 <br />35 <br />37 -49 <br />TS50 <br />4.0 <br />48 <br />37 -49 <br />TS51 <br />0.9 <br />11 <br />37 -49 <br />TS69 <br />4.0 <br />48 <br />Average <br />3.0 <br />36 <br />Average (w /o <br />TS51) <br />3.6 <br />43 <br />'All sample points can be seen on Map R -3. <br />2 TS48 +150N was a sample point taken in July 2010 150 feet north of the already sampled point TS48. <br />This was to provide another sample point for the Phase II Area 2 topsoil measuring. <br />5. Continued: Pre fertilizer application fertility sampling results should be reported, if <br />required by the permit. <br />Response: No fertility sampling was conducted on the Phase II release areas prior to <br />fertilizing. <br />6. Prime Farmland Production Documentation: <br />For prime farmlands, adjusted average annual crop production based on at least three <br />cropping years immediately prior to submittal of the application must be demonstrated <br />to be equivalent to, or higher than, the average reference crop yield, pursuant to Rules <br />3.03.1(2)(b), 3.03.1(3)(b), and 4.25.5(3)(a). Topsoil replacement requirements for prime <br />farmlands as specified in Rule 4.25.4 are also more stringent than for non prime <br />farmland reclaimed areas. <br />Response: <br />No prime farmlands are to be found within the Phase II release areas. <br />7. Erosion Control Demonstration: <br />SL -14 03DEC12.wpd 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.