My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-09-08_GENERAL DOCUMENTS - M1977493
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1977493
>
1995-09-08_GENERAL DOCUMENTS - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 7:51:12 AM
Creation date
12/10/2012 7:27:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
9/8/1995
Doc Name
Construction Designs, Schedules, and Project Outlines.
From
Cyprus Climax
To
DMG
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Species Percent <br /> Smooth Brome 19 <br /> Timothy 13 <br /> Red Top 13 <br /> Meadow Foxtail 9 <br /> Orchard Grass 9 <br /> Red Fescue 9 <br /> Hard Fescue 9 <br /> Light Clover 9 <br /> Balbo Rye 10 <br /> 2.2.3 A seed mixture consisting of the following kinds of seed (percent- <br /> age by weight) shall be used on the downstream face of the dam: <br /> ecies Percent <br /> Manchar Smooth Brome 75 <br /> Russian Wild Rye 25 <br /> 2.3 FERTILIZER <br /> Provide granular, pelleted or liquid commercial fertilizer having a 11-46-0 or <br /> 18-46-0 yield, or which fifty percent (50%) of the nitrogen is in slow <br /> release form. <br /> 2.4 MULCH <br /> Mulch may be natural, consisting of slash, brush, manure and vegetation <br /> previously chipped and stockpiled; and/or clean straw, free from noxious <br /> weed seed, mold, and other harmful elements; or wood cellulose fiber. <br /> 3 INSTALLATION <br /> 3.1 DISTURBED AREAS TO BE REVEGETATED <br /> All areas disturbed by the construction process outside the normal reservoir <br /> pool area shall be provided with a layer of topsoil, seeded, fertilized and <br /> mulched. These areas include any fill areas, including the downstream face <br /> of the dam embankment fill and toe area, and any construction staging <br /> areas. <br /> 3.2 TOPSOIL <br /> SPEC.F-TOPSOIL,SEEDING AND MULCHING <br /> PAGE 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.