My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-09-08_GENERAL DOCUMENTS - M1977493
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1977493
>
1995-09-08_GENERAL DOCUMENTS - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 7:51:12 AM
Creation date
12/10/2012 7:27:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
9/8/1995
Doc Name
Construction Designs, Schedules, and Project Outlines.
From
Cyprus Climax
To
DMG
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1 <br /> EAGLE PARK RESERVOIR <br /> OUTLET WORKS INSTALLATION <br /> RECONNAISSANCE COST ESTIMATE <br /> .. . .. ......... .......... ........... ........ ............................... ................................................................... <br /> ... ...... . <br /> .................................. <br /> • <br /> ................... :::•Qf ........ ........ <br /> . ... ...... .... . .... <br /> •.......... .... . ..... <br /> .11TIM •::......................... .... IT. <br /> . . . .. ... ......... . ............ . ....................... .................... ...... . ................... ........ ....... ... ...... ................................ <br /> Mobilization/Demobilization L.S. $10,000 <br /> Remove/Replace power poles L.S. 11000 <br /> Grout bypass conduit, install cutoff L.S. — 23,000 <br /> Excavate to Elev. 10,680 10,700 c.y. $6.00 64,200 <br /> Outlet, 24" RCP Class V 195 ft 30.00 51860 <br /> Concrete pipe cradle 36 c.y. 500.00 18,000 <br /> Concrete cutoff collars (qty 6) 6.5 c.y. 600.00 3,900 <br /> 3" Gage pipe L.S. — 2,000 <br /> Inlet structure 7.2 c.y. 600.00 4,320 <br /> 4' Vent pipe 150 ft 8.00 1,200 <br /> Trash Rack L.S. — 1,400 <br /> Place &compact fill 10,700 c.y. 7.50 80,250 <br /> Gate, stem &operator L.S. — 5,300 <br /> Place r1prap 300 c.y. 13.00 3,900 <br /> RCP field leakage test L.S. 500 <br /> Subtotal $224,820 <br /> Engineering (10%) $22,480 <br /> Total $247,300 <br /> Nato: This estimate assumes bypass conduit is in adequate oondtkm for grouting. If removal of the conduit is required, <br /> construction costs will be significantly higher. <br /> Erosion protection of to discharge channel beyond STA 4+89 is considered separately from this project and is not included <br /> in this estimate. <br />
The URL can be used to link to this page
Your browser does not support the video tag.