My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-10-22_GENERAL DOCUMENTS - M1977493
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1977493
>
1996-10-22_GENERAL DOCUMENTS - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2021 2:45:41 PM
Creation date
12/10/2012 7:27:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
10/22/1996
Doc Name
Approval of Construction
From
OSE
To
WW Wheeler and Associates, Inc.
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�`v`t�r III IIIIIIIIIIIII III <br /> 999 <br /> STATE OF COLOKADO <br /> OFFICE OF THE STATE ENGINEER <br /> pF•COS <br /> Division of Water Resources <br /> Department of Natural Resources N p <br /> 1313 Sherman Street, Room 818 <br /> Denver,Colorado 80203 1A76` <br /> Phone(303) _/ ` <br /> FAX(303)866-3589 6-3589 f/,� Roy Romer <br /> Governor <br /> James S.Lochhead <br /> Executive Director <br /> Hal D Simpson <br /> October 22, 1996 State Engineer <br /> Mr. Douglas C. Seely, P.E. <br /> WW Wheeler and Associates, Inc./ <br /> 3700 Inca Street <br /> Englewood, CO 80110 <br /> When replying, please refer to: <br /> Climax Moly No.4 Dam(aka,Eagle Park Res.) <br /> Division 5, DAMID 370103 <br /> SUBJECT: ►'Approval of Construction <br /> Dear Mr. Seely: <br /> Based upon our final inspection, and your submittal of the AS-CONSTRUCTED <br /> plans, construction report, and certification of completion, the work is accepted for this <br /> 135 foot high dam, 2160 acre-foot' reservoir. Storage is contingent upon the following: <br /> 1- Submittal and approval of an updated Emergency Preparedness Plan by all <br /> holders of the plan. <br /> 2- Installation of the trash rack in accordance with the plans. <br /> 3- Completion of the seepage/pumpback line, and <br /> 4- Implementation of the initial reservoir filling and monitoring plan. (See additional <br /> requirements for monitoring below.) <br /> Also (Not a condition for filling), the reservoir depth-area-capacity tables/curves <br /> shall be submitted to our Division Engineer's office in Glenwood Springs as soon as <br /> possible after doing the surveys. By copy of this letter, the owner is reminded that they <br /> are responsible for monitoring all the instrumentation in accordance with Rule 15.C. of our <br /> Rules and Regulations for Dam Safety and Dam Construction, September 30, 1988. This <br /> includes surveys of the movement monuments, and measuring and recording the <br /> leakage. We request that you prepare a written plan for observing the dam and <br /> 'Subject to change <br />
The URL can be used to link to this page
Your browser does not support the video tag.