Laserfiche WebLink
Mr. Peter Foster December 6, 2012 <br />Page 7 of 7 <br />Colona Gravel Pit, Substitute Water Supply Plan <br />Please contact Mike Bender in Denver at (303) 866 -3581, or Bob Hurford, <br />Division Engineer, in Montrose at (970) 249 -6622, if you have any questions concerning this <br />approval. <br />JD /IDC /GMB: Colona Pit SWSP 11 -13 doc <br />Sincerely, <br />Jeff Deatherage, P.E. <br />Chief of Water Supply <br />Attachments: Figure 1 — 2011 Exposed Water Surface <br />Table 1 — Evaporation Calculations <br />Table 2A — Year One Water Depletions <br />Table 2B — Year Two Water Depletions <br />Table 3 — Out of Priority Depletions <br />Table 4 — Maximum Water Depletions and Augmentation Supply <br />Appendix A — Example Accounting Sheet <br />Appendix B1 — Glover Analysis — Year One <br />Appendix B2 — Glover Analysis — Year Two <br />Affidavit dated May 23, 2011 — Water Rights Pro Rata Dedication <br />DRMS letter dated April 30, 2010 <br />Water Lease Contracts for Ridgeway Reservoir and Blue Mesa Reservoir <br />Cc: Bob Hurford, Division Engineer <br />Luke Reschke, Water Commissioner, District 41 <br />Division of Reclamation, Mining and Safety <br />