Laserfiche WebLink
Month <br />(1) <br />(2) 1 <br />(3) <br />Out -of- Priority <br />Lagged <br />Depletions <br />Replacement Water Committed <br />for Augmentation <br />Blue Mesa <br />Reservoir <br />Ridgway <br />Reservoir <br />(acre -feet) <br />(acre -feet) <br />(acre -feet) <br />October <br />5.5 <br />5.7 <br />November <br />6.1 <br />6.7 <br />December <br />5.4 <br />5.9 <br />January <br />1.6 <br />1.8 <br />February <br />0.0 <br />0.0 <br />March <br />0.0 <br />0.0 <br />April <br />0.0 <br />0.0 <br />May <br />0.0 <br />0.0 <br />June <br />0.0 <br />0.0 <br />July <br />0.0 <br />0.0 <br />August <br />0.0 <br />0.0 <br />September <br />0.0 <br />0.0 <br />Annual <br />18.6 <br />14.3 <br />5.7 <br />Table 4 <br />Maximum Water Depletions and Augmentation Supply <br />United Companies - Colona Gravel Pit SWSP <br />Notes: <br />(1) Table 3, Column 14. <br />(2) Blue Mesa Reservoir augmentation supply from November through March, includes 8.9% transit loss. <br />(3) Ridgway Reservoir augmentation supply from April through October, includes 1.65% transit loss. <br />P: \061- 052 \000 - Colona \swsp\2011 SWSP Renewal \Updated Renewal for Two Yealright Water Engineers, Inc. <br />Updated Tables August 2012 - Return Flows.xls 10/23/2012 <br />