My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-11-29_REVISION - M1977493
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
1995-11-29_REVISION - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:27:02 PM
Creation date
12/10/2012 7:27:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
11/29/1995
Doc Name
EPP
From
DMG
To
Climax
Type & Sequence
TR7
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
999 <br /> 5TATE OF COLOMDO <br /> DIVISION OF MINERALS AND GEOLOGY <br /> Department of Natural Resources P 7, <br /> 1313 Sherman St, Room 215 <br /> Denver,Colorado 80203 <br /> Phone (303)866-3567 <br /> FAX:(303)832-8106 <br /> � <br /> DEPARTMENT OF <br /> /i,November 29, 1995 NATURAL <br /> / RESOURCES <br /> Mr. Jay Jones p Roy Romer <br /> Climax Molybdenum Company `V/ Governor <br /> P.O. BOX 68 James Lochhead <br /> Executive Director <br /> Empire, CO 80438 <br /> Michael B Long <br /> Division Director <br /> RE: Environmental Protection Plan, Climax Mine and Mill, <br /> Technical Revision TR-07i", Permit No. M-77-493 <br /> Dear Mr. Jones: <br /> The Division has reviewed the above referenced technical revision <br /> submittal, and has determined that certain aspects of the revision must <br /> be clarified, and additional information provided prior to approval. <br /> Please provide a response to the concerns tabulated below. In accordance <br /> with your letter dated November 16, 1995, it is the Division's <br /> understanding that you intend to provide your responses by February 1, <br /> 1996, or, if you anticipate any difficulty in meeting the February 1, 1996 <br /> date, the Division will be notified by January 15, 1996. I do apologize <br /> that the Division's review took more time than we had originally <br /> anticipated, and thank you for the efforts of everyone involved in the <br /> preparation of your Environmental Protection Plan (EPP) application. <br /> 1. The Division concurs with the proposal in section 1. 1.2 of the EPP <br /> application on how to handle changes in referenced information and <br /> documents, however, in accordance with Rule 8.3 of the Mineral Rules <br /> and Regulations, updates to the Emergency Response Plan involving <br /> responsible personnel and their phone numbers, or involving the list <br /> and location map of materials, supplies and equipment for <br /> containing, controlling and cleaning up of designated chemicals, <br /> must be provided to the Division prior to implementation of any <br /> changes. <br /> 2 . The EPP application identifies the ore body beneath Bartlett <br /> Mountain at the Climax Mine as acid forming material. Data included <br /> in Appendix C to the EPP indicates that Climax Mine overburden and <br /> country rock also has acid forming potential. As such, and in <br /> accordance with Rule 6.4. 19 (2) , map(s) , Sketch(es) , plan(s) , or <br /> other equivalent representations must be provided that depict the <br /> lateral and vertical extent of the workings. <br /> 3 . Rule 6.4. 19 (10) (b) requires that a copy of the site Storm Water <br /> Management Plan (SWMP) be provided with the EPP. The Division has <br /> requested a copy of the Climax Mine SWMP as part of the adequacy <br /> review for the ground water technical revision (TR-08) . Submittal <br />
The URL can be used to link to this page
Your browser does not support the video tag.