Laserfiche WebLink
The motor control center will consist of the following proposed line-up from right <br /> to left: <br /> A. Control Section A, this will house the Reliance PLC and other control <br /> components. <br /> B. Main Service Entrance Breaker Section B <br /> C. Vertical Section C <br /> 1. Power Monitor Digital Display cubicle- will display voltage, current, <br /> KW, KVA, KWHR, etc. <br /> 2. Distribution Transformer TRA - 15 KVA 480 volt primary and <br /> 208/120 volt, 3-phase, 4 wire secondary. <br /> 3. Distribution Panelboard DPA - for 120 volt distribution for lighting <br /> and receptacle loads. <br /> D. Vertical Section D <br /> 1. Vent Fan FVNR starter cubicle. <br /> 2. Bubbler Air Compressor circuit breaker disconnect cubicle. <br /> 3. Surge Air Compressor circuit breaker disconnect cubicle. <br /> 4. 3 KVA Control Transformer cubicle for 120 volt power to the <br /> instrumentation and control panel. <br /> 5. Spare Cubicle for future use. <br /> E. Vertical Section E <br /> 1. Pump P-104, 300 hp, Solid-state starter cubicle. <br /> F. MCC Corner Section <br /> G. Vertical Section F <br /> 1. 15 KW, 480 volt, 3-Phase, Electric Heater #1 feeder breaker <br /> cubicle. <br /> 2. 15 KW, 480 volt, 3-Phase, Electric Heater #2 feeder breaker <br /> cubicle. <br /> 3. Traveling Hoist feeder breaker cubicle. <br /> 4. Welding Receptacle 480 volt, 60amp, 3 phase feeder breaker <br /> cubicle. <br /> 5. 150 hp VFD feeder breaker cubicle. (Future) <br /> 6. Spare Cubicles for future use. <br /> 13 <br />