Laserfiche WebLink
TABLE 1 <br /> HYDROLOGY MONITORING REQUIREMENTS <br /> NEW ELK AND GOLDEN EAGLE MINES <br /> Revised Stipulation No. 12 - New Elk Mine <br /> and Stipulation No. 10 - Golden Eagle Mine <br /> August, 1985 <br /> Water Level Field Short Discharge <br /> Site or Flow Measurement List* List* <br /> PRS-1 M M A <br /> PRS-2 M M A <br /> PRS-3 M M A <br /> MDNE-1 M M A Q <br /> 10GE-1 M M A Q <br /> CCS-1 M M A Q <br /> CCS-2 M M A Q <br /> ACF-1** C Q <br /> SCF-I** C Q <br /> PAW-1 Q Q A <br /> PAW-2 Q Q . A <br /> PAW-5 Q Q A <br /> Paw-6 Q Q A Q <br /> Backfilled <br /> Channel A'W <br /> (East) Q Q A <br /> Backfilled <br /> Channel AW <br /> (West) Q Q A <br /> RDA Pond <br /> Effluent A <br /> ACAW-1** Q Q A <br /> C CAW-1 Q Q A <br /> Key <br /> C = continuously <br /> M = monthly <br /> Q = quarterly (Februar May, August, November) <br /> A = annually (Novembe <br /> * See attached table for parameters included in each suite. <br /> ** Not required until further disturbance as per revised Stipulation No. 14 <br /> 3081;/c j <br /> -31- <br />