My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1986-03-03_REPORT - C1981013 (4)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981013
>
1986-03-03_REPORT - C1981013 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2020 5:19:48 AM
Creation date
12/7/2012 1:14:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Report
Doc Date
3/3/1986
Doc Name
1985 Annual Hydrology Report (Part 1 0f 2)
From
Wyoming Fuel Company
Annual Report Year
1985
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STIPULATION 3 <br /> A. Water Removed from the Purgatoire River <br /> Water removed from the Purgatoire River for use in the mine is dependent upon the <br /> mine production rate. The estimate is based on 80 pounds of water required per ton of <br /> coal mined at the present projection of 45,000 tons per month production. This yields a <br /> requirement of 19,700 gallons per operating day or consumptive use of the mine. <br /> B. Water Discharged from the Surface Plant <br /> The following estimate is based on total employment of 150 people and 100 gallons <br /> per day per person. The source of this water is the Trinidad water line. Water use would <br /> be 15,000 gallons per day which would be treated following use and discharged. <br /> C. Mine Water Discharge <br /> Water made in the mine is pumped to the surface, clarified and discharged. This <br /> discharge has varied from 31 gpm when the mine is idle to 70 gpm when at 2,000 tons per <br /> day production. It is estimated that 70 gpm of mine discharge water will be generated <br /> when mining resumes. <br /> SUMMARY <br /> Gallons/Day <br /> Operating Day Calendar Day <br /> From River (all consumed) 19,700 14,070 <br /> Discharge <br /> From Treatment Plant 15,000 10,714 <br /> From Mine 100,000 100,800 <br />
The URL can be used to link to this page
Your browser does not support the video tag.