Laserfiche WebLink
Climax Mine <br /> • Climax Mine <br /> — August 5, 1993 - Meeting between DMG and Cyprus. <br /> » Review Preliminary Ground Water Monitoring Plan (Permit No. M 77- <br /> 493). <br /> • Tenmile Drainage <br /> — Monitoring of two ground water monitoring wells since 1987. <br /> — No impacts to the ground water. <br /> • Eagle River Valley <br /> — No ground water present below No. 4 Dam. <br /> — No ground water impacts to the Eagle Basin. <br /> » No.4 Dam cut-off wall. <br /> » Bedrock low permeability. <br /> — Voluntary Installation of well between Robinson Lake and No. 4 Dam. <br /> • Arkansas River Drainage <br /> — No need for ground water monitoring in the Arkansas basin based on <br /> current activity. <br /> — Baseline monitoring well located at property boundary. <br /> • Preliminary Ground Water Monitoring Plan <br /> — Characterization of ambient ground water quality by the end of 1st quarter <br /> 1995. <br />