My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-09-08_HYDROLOGY - M1977493
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977493
>
1995-09-08_HYDROLOGY - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 7:36:38 AM
Creation date
12/7/2012 11:09:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
HYDROLOGY
Doc Date
9/8/1995
Doc Name
Approval of Plans And Specifications for Construction.
From
OSE
To
W. W. Wheeler and Assoc.
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1111111111111111111 <br /> 999 STATE, OF COLOMDO <br /> OFFICE OF THE STATE ENGINEER of oo� <br /> Division of Water Resources <br /> Department of Natural Resources ti ' o' <br /> 1313 Sherman Street,Room 818 <br /> Denver,Colorado 80203 (,�/ /�� '1876` <br /> Phone(303)866-3581 7 7 <br /> FAX(303)866-3589 <br /> S Roy Romer <br /> Governor <br /> James S Lochhead <br /> July 14, 1995 Executive Director <br /> t�5� Hal D.Simpson <br /> Mr. Douglas C. Seely, P.E. Q, v`1`eC�\J�Ueo\ogy State Engineer <br /> W. W. Wheeler and Assoc. <br /> 3700 So. Inca St. ;vls�on <br /> Englewood, CO 80110 <br /> When replying please refer to: <br /> EAGLE PARK (Climax #4), C-1106B <br /> W. Div. 5, DAMID: 370103 <br /> SUBJECT: /Pproval of Plans and Specifications for Construction <br /> Dear Mr. Seely: <br /> We are transmitting one set of approved specifications and one mylar cover sheet with approval <br /> signatures for the referenced dam. Approval was made on July 14, 1995. <br /> The alteration of the Eagle Park Dam must be performed under the purview of a professional <br /> engineer. Your attention is directed to Rule 9.A.(copy attached)concerning the observations,coordination <br /> and documentation activities required for this Large, Class 1 Dam. Please keep Mr. Stephen Spann of <br /> this office informed of the construction status so he may meet his obligations under Rule 9.A. as well. <br /> Please submit'AS-CONSTRUCTED'mylar drawings,including the original certification sheet,upon <br /> completion of construction. Final acceptance of the construction will be contingent upon receipt and our <br /> acceptance of the 'AS CONSTRUCTED' drawings, as well as the other requirements of Rule 10 (copy <br /> attached): If you have any questions concerning the filing of'AS CONSTRUCTED' drawings, or any of <br /> the other construction documents, please contact Mr. Spann of our office. <br /> Sincerely, <br /> Alan E. Pearson, P.E. <br /> Principal Engineer <br /> Dam Safety Branch <br /> Attachments <br /> AEP/SAS/Eaglepk.app <br /> c.c. Orlyn Bell, Division Engineer <br /> Cyprus Climax Metals, Owner <br />
The URL can be used to link to this page
Your browser does not support the video tag.