My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-12-09_HYDROLOGY - M1977493
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977493
>
1996-12-09_HYDROLOGY - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2021 11:55:49 AM
Creation date
12/7/2012 11:09:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
HYDROLOGY
Doc Date
12/9/1996
Doc Name
4-Dam Seep Water Return System Modifications
From
DMG
To
Climax
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
999 <br /> STATE OF COLORADO <br /> DIVISION OF MINERALS AND GEOLOGY <br /> Department of Natural Resources pmrt'Wt. <br /> 1313 Sherman St., Room 215 <br /> Denver,Colorado 80203 <br /> Phone:(303)866-3567 <br /> FAX:(303)832-8106 <br /> DEPARTMENT OF <br /> NATURAL <br /> RESOURCES <br /> December 9, 1996 Roy Romer <br /> Governor <br /> James S.Lochhead <br /> Bryce Romig Executive Director <br /> Climax Molybdenum Company Michael B Long <br /> Climax Mine Division Director <br /> Climax,, CO 80249 <br /> RE: /4-Dam Seep Water Return System Modifications, <br /> Submittal of detail for passage of containment <br /> through 4-dam, Climax Mine, Permit No. M-77-493 <br /> Dear Mr. Romig: <br /> The Division has reviewed your letter and attachments dated November 11, <br /> 1996 which are comprised of a proposal to provide geomembrane containment <br /> on the upstream side of the clay barrier at Station 16+80 of the new 4-Dam <br /> seep water return line. The Division concurs with your proposed design, <br /> thus finalizing the Division's design review process for the new seep <br /> water return line. As you know, as-built construction drawings and a <br /> certification report for the seepwater return system must be reviewed and <br /> accepted by the Division prior to placing the facility into service. <br /> If you have any questions, please contact me. <br /> Sincerely, <br /> Allen C. Sorenson <br /> Reclamation Specialist <br /> C:\WP51\CLIMAX4.4DM <br />
The URL can be used to link to this page
Your browser does not support the video tag.