Laserfiche WebLink
Mr. Bryce Romig Page 3 July 25, 1996 <br /> placement of the perforated drainage collection. The collection pipe was wrapped with a <br /> geotextile cloth (as per specification) and was backfilled with a sand/gravel media. <br /> Photographs 13 and 14 show the backfilling and final grading of the site. Photograph 15 <br /> presents a view of the completed grade prior to completion of the collection sumps and <br /> conveyance lines. <br /> I trust this submittal meets with your approval. If you have any questions or comments, <br /> please feel free to contact me at 800/605-9852. <br /> Respectfully, <br /> Titan Environmental Corporation <br /> XJohn F. Lupo, Ph.D., P.E. <br /> Project Manager <br /> JFL/bsf <br /> cc: Jay Cupp - Climax Mine, w/o drawings <br /> John Clapper- Climax Mine, w/o drawings <br /> Attachments <br /> C\PROJECTSl5101-004U.1525101 004 - - - • <br /> _ _ =Environments <br /> - - - ---- <br />