My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-06_REPORT - M1996049
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1996049
>
2012-12-06_REPORT - M1996049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:12 PM
Creation date
12/7/2012 6:58:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1996049
IBM Index Class Name
REPORT
Doc Date
12/6/2012
Doc Name
Annual Report and Map
From
Everist Materials, LLC
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Everist Materials, LLC <br />e cs <br />PO Box 1150 <br />28755 Hwy #9 <br />Silverthorne, CO 80498 <br />Phone 970.468.2521 <br />Fax 970.468.2756 <br />December 4, 2012 <br />State of Colorado <br />Division of Reclamation, Mining, and Safety <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />J. Division of Reclamation, <br />7 U Mining & Safety <br />RE: Annual Report, Map, and Annual Fee Request for M- 1996 -049 <br />RECEIVED <br />GG2O12 <br />Enclosed please find the Annual Report Form, Map, and Annual Fee for the following <br />operation: <br />PERMITTEE NAME: <br />PERMIT NO.: <br />OPERATION NAME: <br />ANNIVERSARY DATE: <br />ANNUAL FEE: <br />COUNTY: <br />Everist Materials, LLC. <br />M- 1996 -049 <br />Maryland Creek Ranch <br />December 20, 2012 <br />$791.00 <br />Summit <br />For 2012, mining operations continued in Cell #4 and backfill using inert fill continued in <br />Cell #3 in an effort to reduce exposed groundwater. <br />For 2013, mining will continue in Cell #4 and the west portion of Cell #3 will be mined <br />in accordance with a permit received from the Army Corps of Engineers. The Army <br />Corps requires concurrent mitigation of the west portion of Cell #3. Additionally, inert <br />fill will be placed in the southern end of Cell #3 until final grades and contours are <br />reached. <br />If you have any questions, please feel free to contact me at 970 - 468 -3632. <br />Sincerely, <br />Joanna Hopkins <br />Planning and Pe i , ing <br />
The URL can be used to link to this page
Your browser does not support the video tag.