Laserfiche WebLink
SAP sampling of reservoir waters commenced in the Nevada Division of Environmental Protection, Bureau of <br /> spring of 1997. Each sampling event included surface water Mining Regulation and Reclamation. 1990. Meteoric <br /> samples from the north, south and east ends of the reservoir. Water Mobility Procedure. <br /> Initial sampling screened for all constituents for which there <br /> were standards. Parameters that were not detected in three Titan Environmental Corp. 1996. Eagle Park Reservoir Post <br /> screening samples were dropped from the parameter list. Reclamation Sampling and Analysis Plan. Titan <br /> Thirteen sampling events occurred between March and Environmental Corp.,Denver,Colorado. <br /> September of 1997. During sampling, freshwater delivery to <br /> the reservoir amounted to 1.9MM m3(1500 acre-feet). By July Voynick, S.M. 1996. Climax: The History of Colorado's <br /> 26, water quality in the reservoir met all standards associated Climax Molybdenum Mine. Mountain Press <br /> with the Segment 3 of the East Fork of the Eagle River. Publishing,Missoula,Montana. <br /> Current quarterly sampling in the reservoir Woodward-Clyde Consultants. 1989. Prefeasibility Level <br /> demonstrates that water quality has stabilized, with most Assessment for Oxide in Dam 4 Considering <br /> parameters measured at or below detection limits. Current Enlargement to Water Storage Dam or Retirement, <br /> sampling includes quarterly monitoring in the center of the Near Climax, Colorado. Woodward-Clyde <br /> reservoir at a depth of 10 m. This depth is consistent with Consultants,Denver,Colorado. <br /> measured thermal stratification in the reservoir. <br /> W.W. Wheeler and Associates. 1994.Yield Analysis for Eagle <br /> Conclusions Park Reservoir and Robinson Reservoir. W.W. <br /> Wheeler and Associates,Englewood,Colorado. <br /> Reclamation of the Eagle Park reservoir demonstrates <br /> the public benefits that can accrue through cooperative Acknowled eg ments <br /> initiatives between industry and regulatory agencies. Water <br /> delivery to the East Fork of the Eagle marks the first time in This paper is published with the permission of <br /> thirty years that water within the Eagle Park Reservoir basin Cyprus Amax Minerals Company. J.W.Danni,L.A.Darling, <br /> will be routed to the original drainage. W.H.Champion,W.B.Rech,A.A.Beierle,C.G.Janes,and R. <br /> Valentine provided technical assistance and advice in critical <br /> Literature Cited reviews. Credit is given to the members of the Eagle Valley <br /> Consortium,and most importantly to the employees of the <br /> AMAX, Inc., 1966, "New Climax Plant," Amax Journal, Vol. Climax Molybdenum Company,Climax Mine. <br /> 4,No.4,Amax,Inc.,New York,pp 1-6. <br />