Laserfiche WebLink
Jul -29-98 10: 56A p _ 02 <br /> CLIMAX MINE—FlWLE PARK RFS[il IIIIIIIIIIIIIIIIIII <br /> July'l5, 1998 <br /> SI.OPC MONITORING <br /> PROGRESS REPOR'1 <br /> The following is a measurement comparison of slope monitoring points relative to each other as observed front <br /> control points CP#1 (Oxide),CP 4162 and CP W4,The coordinate values for these points were held tired from <br /> valuer taken from an adjustit►ent of coordinates rut on September 2'"'.. 1997 using the STAR"NET Adjustment <br /> Program. <br /> Field work represented the fourth visit to the site: <br /> On July 22n" 1998 a field crew consisting of Dan Muth and Zane Wilson collected set obscrvations and <br /> perfortned a level circuit on the three dart monitoring points MI 1.M12 and M13.This data was Ilion compared <br /> to data recorded from the previous visit to the site on June 22"' 1998. <br /> Table l below,represents the calculated differences between the field observations recorded on Iwie 22"' 1998 <br /> versus those observations recorded on July 22-'1998, <br /> 6-22 98 7-22.98 <br /> Point# Point# Code ANorth DEast. AIlt, Azimuth <br /> I 1 11 MON 11 0,003 -0,004 0.009 0,005 N52"38'58"W <br /> 12 12 MON 12 0.019 0.016 -0.002 0.02.1 N39052'45"F <br /> 13 13 MON 13 0.021 0.019 -0 047 0,028 N40148'1 1"G <br /> Table 1.Oitr rcnurex between bfenituring Point lnculiurrs.Jn(v 22,1998. <br /> CONCL U,SIONS: <br /> The difTe:ences between Monitoring Points 11, 12 and 13 were caiculawd using the data recorded from <br /> the June 22""and July 22"`t surveys. No tangible movements among the monitoring points-,verc observed. <br /> Reference report.dated June 20' 1998, <br /> Report submitted for and on behalf of <br /> Western States Surveying,Inc. <br /> By <br /> Charles N Beckstrom <br /> N!('SI 1()R NtJAtIJ6'R•R464.019 PAVE J 01`1 <br />