Doc Name
Resolutions of Findings and Coditions for Eagle Park
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Condition No. 1 <br /> Climax Molybdenum Company ("Climax") will maintain water levels and operational controls <br /> on Eagle Park Reservoir to prevent delivery of water to the Eagle River until such time as <br /> the Division of Minerals and Geology ("DMG") has accepted and approved all data from the <br /> approved monitoring plan up to and including water quality data from the sampling event <br /> conducted in the second quarter of 1998. These data were provided in the June 8, 1998 <br /> meeting at the WQCD offices. Condition 1 has therefore been satisfied. <br /> Condition No. 2 <br /> The DMG will hold the option to rescind its conditional finding that post mining land use of <br /> developed water resources for Eagle Park Reservoir has been achieved if, upon review of <br /> the data and consultation with the Water Quality Control Division ("WQCD"), it is determined <br /> that the discharge results in exceedences of the chronic water quality standards. The <br /> conditional finding will become final based the acceptance of a report on data gathered over <br /> a three-year monitoring period. <br /> The monitoring period will commence with the first release of water and occur during the first <br /> three years of reservoir water delivery. <br /> Data used to judge long-term performance would be obtained by sampling the reservoir <br /> water at the outlet works during delivery. Sampling during reservoir water deliveries will be <br /> conducted as suggested in the April 6 1998 DMG letter (page 3, item d). Concurrent <br /> sampling in the East Fork of the Eagle River below the confluence of reservoir and river <br /> waters during reservoir deliveries will be conducted in order to compare data in the final <br /> report. Quarterly sampling in the reservoir will continue through the fourth quarter of 1998 <br /> as agreed to in the April 6, 1998 letter from DMG. Climax uses a depth bomb water <br /> sampling device made of Teflon to extract samples from depth in the reservoir. Collection <br /> and sampling methodologies are aligned with the Sampling and Analysis Plan (SAP) <br /> submitted in the April 15, 1997 Eagle Park Reservoir data summary for the reservoir. <br /> Upon completion of the three-year period, a report will be submitted to the DMG that <br /> summarizes the data and compares the reservoir water quality with in-stream'water quality <br /> and the applicable standards. An anti-degradation type evaluation will be included in this <br /> report. If the data demonstrate that degradation has occurred during the first three years of <br /> reservoir water delivery, DMG's consideration of final approval of SR-002 will be continued <br /> while investigation is conducted into the source of contaminants that caused degradation to <br /> occur. The plan for the investigation will be developed by Climax and subject to DMG <br /> review and approval. If the investigation determines that the contaminant source is related <br /> to the operations of the Climax Mine, the source will be mitigated in accordance with a plan <br /> approved by the DMG prior to SR-002 final approval. <br /> Contingency monitoring and response will be performed as follows: <br /> • If an exceedence of a water quality standard is measured in the release from the <br /> Eagle Park Reservoir weekly monitoring shall commence at a location downstream <br /> of the confluence between the reservoir release and the Eagle River, for parameters <br /> agreed upon by Climax and DMG, If an exceedence is noted at the downstream <br /> monitoring location for the same parameter(s) for two consecutive tests, DMG will be <br /> notified and Climax will take the necessary measures to determine the source of the <br /> exceedence. This may include monitoring the reservoir outlet, monitoring within the <br /> reservoir, verification that the cut off systems are properly functioning, monitoring <br /> 3 <br />