My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-10-22_HYDROLOGY - M1977493
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977493
>
1997-10-22_HYDROLOGY - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2021 8:26:13 PM
Creation date
12/5/2012 9:18:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
HYDROLOGY
Doc Date
10/22/1997
Doc Name
No. 4 Dam Seep Station Pump Back Line Test- Certification.
From
Climax
To
DMG
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
!/ 1111111111111111111 <br /> 9 <br /> © CLIMAX MOLYBDENUM COMPANY coLoRADO OPERATIONS <br /> Climax Mine <br /> A Division of Cyprus Climax Metals Co <br /> Hwy.91 <br /> Climax,Colorado 80249 <br /> (719)486-2150 <br /> Fax:(719)486-2251 <br /> October 21, 1997 <br /> 'QG1 2 Z 1997 <br /> Mr. Allen C. Sorenson <br /> Reclamation Specialist / <br /> State of Colorado- Division of Natural Resources <br /> Division of Mining and Geology <br /> State of Colorado <br /> 1313 Sherm-nn Street Pnnm 215 <br /> Denver, CO 80203 <br /> RE: NO. 4 DAM SEEP STATION PUMP BACK LINE TEST-CERTIFICATION <br /> Dear Mr. Sorenson: <br /> Climax maintenance personnel have completed the No. 4 Dam Seep Station Pump Back Pipe <br /> Line Test. The test was completed in accordance with Chevron Plexco (the pipe Manufacture) <br /> System Testing Application Note No. 8. The method used was the "Non-monitored make-up <br /> Water Test." This letter is confirmation that as of September 11, the system met the <br /> Manufacture's criteria for a leakage free line and that system was constructed as designed (with <br /> the exception of the leak collection system). <br /> The pressure drop switch will be installed in the near future. <br /> Sin ely, <br /> Ronald J. Val ine, P.E. <br /> Climax Engineering Manager <br /> xc: Jay Cupp -Climax Mine Superintendent <br /> Steve Maly -W.W. Wheeler&Associates, Inc. <br /> Bryce Romig -Climax Environmental Coordinator <br /> file.c/allfiles/project/4dampump/pipetest <br />
The URL can be used to link to this page
Your browser does not support the video tag.