Laserfiche WebLink
!/ 1111111111111111111 <br /> 9 <br /> © CLIMAX MOLYBDENUM COMPANY coLoRADO OPERATIONS <br /> Climax Mine <br /> A Division of Cyprus Climax Metals Co <br /> Hwy.91 <br /> Climax,Colorado 80249 <br /> (719)486-2150 <br /> Fax:(719)486-2251 <br /> October 21, 1997 <br /> 'QG1 2 Z 1997 <br /> Mr. Allen C. Sorenson <br /> Reclamation Specialist / <br /> State of Colorado- Division of Natural Resources <br /> Division of Mining and Geology <br /> State of Colorado <br /> 1313 Sherm-nn Street Pnnm 215 <br /> Denver, CO 80203 <br /> RE: NO. 4 DAM SEEP STATION PUMP BACK LINE TEST-CERTIFICATION <br /> Dear Mr. Sorenson: <br /> Climax maintenance personnel have completed the No. 4 Dam Seep Station Pump Back Pipe <br /> Line Test. The test was completed in accordance with Chevron Plexco (the pipe Manufacture) <br /> System Testing Application Note No. 8. The method used was the "Non-monitored make-up <br /> Water Test." This letter is confirmation that as of September 11, the system met the <br /> Manufacture's criteria for a leakage free line and that system was constructed as designed (with <br /> the exception of the leak collection system). <br /> The pressure drop switch will be installed in the near future. <br /> Sin ely, <br /> Ronald J. Val ine, P.E. <br /> Climax Engineering Manager <br /> xc: Jay Cupp -Climax Mine Superintendent <br /> Steve Maly -W.W. Wheeler&Associates, Inc. <br /> Bryce Romig -Climax Environmental Coordinator <br /> file.c/allfiles/project/4dampump/pipetest <br />