Laserfiche WebLink
Letter to Frank Zancanella 2 January 7, 1994 <br /> culverts. These protective measures were discussed during the <br /> Division's site inspection on 9/28/93, and it was decided that the <br /> tailing relocation pipeline alignment would be inspected during a <br /> subsequent site visit. The Division can approve TR-005 with the <br /> understanding that the adequacy of the ditches and culverts <br /> associated with the tailing relocation pipeline will be the topic <br /> of a future site inspection. <br /> If Climax will commit to the two understandings discussed above, <br /> the Division will provide approval for technical revision TR-005. <br /> Be advised that the decision deadline for TR-005 is January 25, <br /> 1994. <br /> If you have any questions, please contact me. <br /> Sincerely, <br /> Allen C. Sorenson <br /> Reclamation Specialist <br /> C: \WP51\CLIMAX.TR5 <br />