Laserfiche WebLink
t � t <br /> sheet 1 of 8 <br /> Colorado Division of Minerals and Geology <br /> --___------------------------------------ <br /> ESTIMATING FORM - STRUCTURAL DEMOLITION WORK <br /> -------------------------------------------- <br /> Task No.: 4 Prepared by ACS <br /> Permit No.: M-77-493 Filename M493-4 <br /> Date 02-May-97 Operation Climax Mine <br /> ------------------ -------------------------------- <br /> Permitting action Reevaluate amount of required bond <br /> --------------------------------------_--_----------------------_---------------_-----------_---------- <br /> Task description Demolish Buildings and Structures <br /> --------------------------------------------_--------------------___--------------__------------------- <br /> MEANS Location Adjustment: 105.50% of base unit costs - MEANS SITE WORK & LANDSCAPE COST DATA : 1995 Edition <br /> ------------------ --------- <br /> I I MEANS BASE ADJUSTED <br /> STRUCTURE / FACILITY / EQUIPMENT DESCRIPTION I DIMENSIONS I COMPOSITION QUANTITY I UNIT I UNIT COST TOTAL COST <br /> --------------___________I==--------------___=====1=====___=====1==========1========1=====_=====1=====_______ <br /> 7 SHAFT FAN HOUSE - SUPERSTRUCTURE 45'L X 115'W X 40'H I STEEL 207,000 I CU.FT. I $0.18 $39,309 <br /> - FLOOR (10"T w/rebar) 45'L X 115'W I CONCRETE 5,175 I SQ.FT. I $4.73 I $25,824 <br /> - FOOTING (1.5'T X 2.01W) 45'+45'+115'+115' I CONCRETE 320 I LIN.FT. I $11.40 I $3,849 <br /> - HIGH CONCRETE I ASSUME 6" X 320 SQ.FT. I CONCRETE 320 SQ.FT. I $7.08 I $2,390 <br /> STK AGGREGATE BINS - SUPERSTRUCTURE I 65'L X 15'W X 16'H TIN I 15,600 I CU.FT. $0.18 I $2,962 <br /> - FLOOR (811T plain) I 65'L X 15'W CONCRETE I 975 I SQ.FT. I $3.16 I $3,250 <br /> - FOOTING (1.0'T X 2.OW) 65'+65'+15'+15' CONCRETE I 160 I LIN.FT. I $7.91 I $1,335 <br /> STK SHOP DIESEL TANK- SUPERSTRUCTURE 201L X 121W X 5'H STEEL I 1,200 I CU.FT. I $0.18 I $228 <br /> FLOOR (811T plain) I 20'L X 12'W I CONCRETE I 240 I SQ.FT. I $3.16 I $800 <br /> FOOTING (1.0'T X 2.OW) I 20'+20'+12'+12' I CONCRETE 64 I LIN.FT. I $7.91 I $534 <br /> 1200 LEVEL DECLINES- SUPERSTRUCTURE I 210'L X 25'W X 20'H I CONCRETE 105,000 CU.FT $0.23 I $25,478 <br /> FLOOR (12"T w/rebar) 210'L X 25'W I CONCRETE 5,250 SQ.FT. $5.52 I $30,574 <br /> FOOTING (1.5T X 2.01W) 210'+210'+25'+25' CONCRETE 470 I LIN.FT. I $10.45 I $5,182 <br /> HIGH CONCRETE ASSUME 121IX52500 SQ.FT CONCRETE 52,500 SQ.FT. $10.36 I $573,815 <br /> STORKE SNOWSHED - SUPERSTRUCTURE I 70'L X 301W X 16'H TIN 33,600 CU.FT. $0.18 I $6,381 <br /> " - FLOOR (811T plain) I 7011, X 301W I CONCRETE 2,100 SQ.FT. $3.16 $7,001 <br /> - FOOTING (1.0'T X 2.0'W) I 70'+70'+30'+30' I CONCRETE I 200 I LIN.FT. I $7.91 I $1,669 <br /> 4 CRUSHER OIL TANK - SUPERSTRUCTURE 10K gal. 25'L X 25'W X 16'H I STEEL I 10,000 CU.FT. I $0.18 $1,899 <br /> - FLOOR (10"T plain) 25'L X 251W I CONCRETE 625 SQ.FT. I $3.80 $2,506 <br /> - FOOTING (1.0'T X 2.0'W) 25'+25'+25'+25' I CONCRETE 100 I LIN.FT.I $7.91 I $835 <br /> STORKE POWDER MAGS - SUPERSTRUCTURE 15'L X 301W X 121H I CONCRETE 5,400 I CU.FT. $0.23 I $1,310 <br /> - FLOOR (12"T w/rebar) 15'L X 30'W I CONCRETE 450 SQ.FT. $5.52 I $2,621 <br /> - FOOTING (1.5'T X 2.0'W) I 15'+15'+30'+30' I CONCRETE 1 90 I LIN.FT. I $10.45 I $992 <br /> " - HIGH CONCRETE I ASSUME 1211X 2160 SQ.FT I CONCRETE I 2,160 SQ.FT. $10.36 I $23,608 <br /> 7 SH TURNING VANES - SUPERSTRUCTURE I 33'L X 271W X 28'H I STEEL I 24,948 CU.FT. I $0.18 I $4,738 <br /> " " - FLOOR (811T w/wire mesh) I 331L X 27'W I CONCRETE I 891 SQ.FT. I $3.55 $3,337 <br /> " - FOOTING (1.0'T X 2.0'W) 33'+33'+27'+27' CONCRETE I 120 I LIN.FT.I $8.70 I $1,101 <br /> STK CRUSHER OIL TANK- SUPERSTRUCTURE 9K gal. 10'L X 10'W X 15'H STEEL I 1,500 CU.FT. $0.18 I $285 <br /> FLOOR (10"T plain) 10'L X 10'W CONCRETE I 100 SQ.FT. $3.80 $401 <br /> FOOTING (1.0'T X 2.0'W) 10'+10'+10'+10' I CONCRETE I 40 I LIN.FT. I $7.91 I $334 <br /> STK CR SWR PMP HSE - SUPERSTRUCTURE I 251L X 181W X 12'H BLOCK I 5,400 CU.FT. $0.18 $1,025 <br /> " " - FLOOR (811T w/wire mesh) I 251L X 181W CONCRETE ( 450 SQ.FT. $3.55 $1,685 <br /> - FOOTING (1.0'T X 2.01W) I 25'+25'+18'+18' I CONCRETE I 86 I LIN.FT. I $8.70 I $789 <br /> STORKE CRUSHER - SUPERSTRUCTURE 1271L X 140'W X 70'H I STEEL I1,244,600 I CU.FT. I $0.18 I $236,350 <br /> - FLOOR (12"T w'rebar) 127'L X 1401W I CONCRETE 1 17,780 I SQ.FT._ I $5.52 I $103,544 <br /> - FOOTING (2.0'T X 3.0'W) 127'+127'+140'+140' I CONCRETE 1 334 I LIN.FT. I $16.26 I $5,730 <br /> - ASBESTOS REMOVAL NA I ASBESTOS 1 1 I ESTIMATI $4,782.00 I $5,045 <br /> I I I I I I <br /> TASK SUBTOTAL - sheet 1 : $1,128,715 <br />