Laserfiche WebLink
• 2 Tailings /waste rock embankments (Revenue Pile and Atlas Pile) <br />• Temporary waste rock stockpile area <br />• Topsoil stockpile areas <br />• Sediment Ponds #1, #2, & #3 <br />• Avalanche protection buffers and cribbing <br />• Mine Equipment storage and maintenance shop building on 6" concrete foundation <br />• Mine offices and Lunch room on 6" concrete foundation <br />• Dry room trailers (3) covered by a corrugated metal building with no foundation <br />• Designated parking and storage areas <br />• Mine access road (compacted gravel) <br />• Compressor Building on 6" concrete foundation <br />• Solid waste storage bins (for trash). Each bin will be 250 gallons in volume. <br />• 3 Ventilation shafts (proposed and not connected to the surface facility area) <br />• 2 power poles <br />• Drainage collection and diversion structures <br />• Ventilation fan at Revenue portal <br />• Septic tank <br />• Tailings Surge Building and Loadout from Mill Tunnel on 6" concrete foundation <br />• 2 x 4200 gallon portable fuel tanks <br />• Small sections of 24' wide mine track <br />• Revenue portal <br />• Mill Portal <br />Revenue Mine August 2012 T -28 <br />