Laserfiche WebLink
As can be seen on Map F -1, the reclaimed condition of the site will require some regrading of <br />slopes to achieve a maximum slope of 3H:1 V and to remove all three ponds. <br />The worst -case reclamation scenario takes place at the time of maximum disturbance area, due to <br />the topsoil requirements. This is the time when the Revenue waste pile, the general mine facilities <br />area, and a small portion of the Atlas waste pile area are all disturbed. This adds up to 11.53 acres <br />of ground to be topsoiled and seeded. A breakdown of the reclamation tasks for the worst -case <br />scenario can be found in Exhibit L. <br />The reclamation timetable is shown in Table E -1 and the costs for the worst -case scenario are <br />calculated in Exhibit L: Reclamation Costs. <br />2. Reclamation Timetable <br />The reclamation timetable below is based on the projections for the mine and the amount of <br />reclamation that is needed after mine shutdown. Once the mine is permanently shut down, the <br />reclamation is expected to take approximately six months. <br />Revenue Mine August 2012 E -2 <br />