Laserfiche WebLink
Build the Best, Be the Best. <br />(cu. es` <br />Psi <br />November 28, 2012 <br />Division of Reclamation, Mining and Safety <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Permit No M- 2006 -078 <br />111 Annual Fee Invoice and Annual Report <br />Sincerely, <br />FLATIRON CONSTR CTORS, INC. <br />Justin DuMond PE <br />Project Manager <br />Cc: Job File <br />RECEIVED <br />NOV 3 0 2012 <br />DIVISION OF RECLAMATION <br />MINING AND SAFETY <br />Flatiron Constructors, Inc <br />10183 E 1 -25 Frontage Rd <br />Firestone, CO 80504 <br />303 485 4050 MAIN <br />303 485 7634 Fax <br />www.flatironcorp.com <br />Flatiron Constructors, Inc. hereby submits its 2012 Annual Report for the Camenish <br />Borrow, Pit Number M- 2006 -078. Check Number 00336829 in the amount of $504.00 <br />was previously submitted separately for the 111 Annual Fee (please see copy of check <br />that was previously sent). <br />Stripping of overburden material and export of material from the Camenish Borrow Pit <br />began at the beginning of May 2007 for the Colorado Department of Transportation, 1 -25 <br />Widening Project No. IM- 0253 -160. Currently, all mining work has been completed. <br />Reclamation work at the pit is complete with perimeter sealing from the surrounding <br />alluvium with compacted core with approval of compacted clay liner from the State <br />Engineer's Office <br />A site inspection was performed with the Division of Reclamation, Mining and Safety for <br />warranty release. Additional seeding and weeded areas were identified. Flatiron is <br />working with revegitation consultant to schedule mowing and interseeding during the <br />2012- 2013 planting season as weather allows. <br />A HOCHTIEF C,vop=ny <br />