My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-20_PERMIT FILE - C1996083A (11)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2012-06-20_PERMIT FILE - C1996083A (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:01:08 PM
Creation date
12/4/2012 12:47:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
6/20/2012
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate TR73
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br />BULLDOZER WORK <br />Task description: Access Road Regrading (9.08 acres) <br />Site: Bowie No. 2 Mine Permit Action: Technical Revision 73 Permit/Job #: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 102 <br />Date: 6/8/2012 <br />User: BFB <br />State: _Colorado <br />County: Delta <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D8T - 8SU <br />Horsepower: 310 <br />Blade Type: Semi- Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: C083 -102 <br />Total unit Cost/Hour: $199.86 <br />Total Fleet Cost/Hour: $199.86 <br />MATERIAL QUANTITIES <br />Initial Volume: 21,974 _ <br />Swell factor: 1.165 <br />Loose volume: 25,600 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 100 feet _ <br />Unadjusted hourly production: 852.6 LCY /hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />5% <br />8,000 feet <br />Material weight: 2,900 Ibs /LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 _(AVG.) <br />Material consistency: 0.900 _ (CAT HB)) <br />Dozing method: 1.000 <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost /Hour: <br />$58.56 <br />NA <br />Operating Cost/Hour: <br />_ <br />$102.81 <br />100 <br />Ripper op. Cost/Hour: _ <br />_ <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total unit Cost/Hour: $199.86 <br />Total Fleet Cost/Hour: $199.86 <br />MATERIAL QUANTITIES <br />Initial Volume: 21,974 _ <br />Swell factor: 1.165 <br />Loose volume: 25,600 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 100 feet _ <br />Unadjusted hourly production: 852.6 LCY /hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />5% <br />8,000 feet <br />Material weight: 2,900 Ibs /LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 _(AVG.) <br />Material consistency: 0.900 _ (CAT HB)) <br />Dozing method: 1.000 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.