Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 100 Page 2 of 2 <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />(AVG.) <br />0.830 <br />(l SHIFT /DAY) <br />0.800 <br />(END -RF) <br />_ 0.903 <br />_ <br />(CAT HB) <br />_ 1.000 <br />_ <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.3209 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />273.60 LCY /hr <br />273.6 LCY /hr <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.730 /LCY <br />Total job time: 123.24 Hours <br />Total job cost: $24,631.37 <br />CIRCES Cost Estimating Software <br />