Laserfiche WebLink
Material consistence: <br />Dozing method: <br />Visibility. <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude: <br />Material Weight <br />Blade type <br />1.000 <br />(CAT HB) <br />1.000 <br />(GEN.) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />0.900 <br />(SSD -FC ) <br />0.903 <br />(CAT HB) <br />1.000 <br />( CAT HB) <br />0.902 <br />( CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.4563 <br />Adjusted unit production 481.67 LCY/hr <br />Adjusted fleet production 481.67 LCY/hr <br />JOB TIME AND COST <br />Fleet size 1 Dozer(s) <br />Unit cost $0 522/LCY <br />Totallob time <br />Total.job cost <br />2.60 Hours <br />$654.06 <br />