Laserfiche WebLink
Material consistence <br />Dozing method <br />Visibility. <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude <br />Material Weight: <br />Blade type: <br />0 900 <br />(CAT HB)) <br />1 000 <br />(UEN ) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />0 800 <br />(FNI) -RF ) <br />0.903 <br />(CAT HB) <br />1 000 <br />(CAT HB) <br />0 793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.3209 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />Fleet size <br />Unit cost <br />224.63 LCY /hr <br />224.63 LCY/hr <br />I Dozer(s) <br />$1 120/LCY <br />Total job time: 3.64 Hours <br />Total job cost: $915.88 <br />