Laserfiche WebLink
Material consistence. <br />Dozing method: <br />Visibilitc: <br />Job efficiency <br />Spoil pile: <br />Push gradient. <br />Altitude: <br />Material Weight <br />Blade type. <br />0.900 <br />(CAT HB)) <br />1 000 <br />(GEN. ) <br />1 000 <br />(AVO. ) <br />0 930 <br />0 SHIFT/DAY) <br />0.900 <br />(FND -KF ) <br />0 903 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.3209 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />399.94 LCY /hr <br />398.94 L C Y/hr <br />Fleet size- 1 Dozer(s) <br />Unit cost: $0 631/LCY <br />Total job time <br />Total job cost <br />6.50 Hours <br />$ 1,635.26 <br />