Laserfiche WebLink
BULLDOZER WORK <br />Task description Regrade GVB -B13F Drill Pad <br />Site Bo«vie No. 2 Mine Permit Action: Minor Revision 133 Permit /Job# C 1996083 <br />PROJECT IDENTIFICATION <br />Task #. 285 State <br />Date 11/19/2012 County <br />User SLB <br />Colorado <br />Delta <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9SU <br />Horsepox er: <br />405 <br />Blade Type: <br />Seim - Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source. <br />(CRG) <br />Cost Breakdown. <br />Abbreviation. <br />Filename, <br />Total unit Cost/Hour $251 56 <br />Total Fleet Cost/Hour $251.56 <br />MATERIAL QUANTITIES <br />Initial Volume 2,226 <br />Swell factor. 1 165 <br />Loose volume 2 „593 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance <br />Unadjusted houriv <br />production <br />100 feet <br />1.243.2 LCY /hr <br />Materials consistencN description: Compacted fill or embankment U 9 <br />Average push gradient: <br />Average site altitude <br />5% <br />7,500 feet <br />Material i eight 2,900 lbs/LCY <br />Weight description <br />rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG ) <br />None <br />0083 -285 <br />Utilization % <br />OiNnership Cost/Hour <br />$72.40 <br />NA <br />Operating Cost/Hour <br />$14069 <br />1()() <br />Ripper op Cost/Hour <br />$() ()() <br />() <br />Operator Cost/Hour <br />$3949 <br />NA <br />Total unit Cost/Hour $251 56 <br />Total Fleet Cost/Hour $251.56 <br />MATERIAL QUANTITIES <br />Initial Volume 2,226 <br />Swell factor. 1 165 <br />Loose volume 2 „593 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance <br />Unadjusted houriv <br />production <br />100 feet <br />1.243.2 LCY /hr <br />Materials consistencN description: Compacted fill or embankment U 9 <br />Average push gradient: <br />Average site altitude <br />5% <br />7,500 feet <br />Material i eight 2,900 lbs/LCY <br />Weight description <br />rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG ) <br />None <br />0083 -285 <br />