Laserfiche WebLink
Material consistence: <br />Dozing method: <br />Visibilite <br />Job efficiency: <br />Spoil pile. <br />Push gradient: <br />Altitude <br />Material Weight <br />Blade hype <br />1.000 <br />(CAT HB) <br />1 000 <br />(UEN ) <br />1 000 <br />(AVU ) <br />0 830 <br />(1 SHIFT/DAY) <br />0.900 800 <br />(FND -RF ) <br />0.903 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0 902 <br />(CAT HB) <br />1 000 <br />(PAT) <br />Net correction: 04056 <br />Adjusted unit production 369 30 LCY /hr <br />Adjusted fleet production: 369.3 LCY/hr <br />JOB TIME AND COST <br />Fleet size: I Dozer(s) <br />Unit cost- $0 681/LCY <br />Total job time 1.07 Hours <br />Total job cost $268.22 <br />