Laserfiche WebLink
Abatement Step 3: Submit to DRMS an engineer certification that Sedimentation Pond NHN -001 has <br />been constructed as designed. This certification shall be submitted as a Minor Revision to the permit. If <br />changes to the approved design have been made, the certification shall be submitted as a Technical <br />Revision to the permit. Abatement Date: On or before December 21, 2012. <br />As -Built engineering certification documentation is Included with this submittal. <br />Upon acceptance by DRMS of this Permit Revision, WFA is seeking approval to recommence topsoil <br />removal activities in the area contained by Pond NHN -001. Additionally, please insert this revision into <br />Volume 3 of 4 in Appendix 2.05.3(4) and 2.05.3(4) -6 of the NHN Mine Permit No.C- 2010 -089. <br />Please let me know if you have any questions. <br />Sin rely, <br />Douglas C. White, <br />Director of Technical Services <br />Cc: Ms. Sandra L. Brown, DRMS <br />Lance Wade, NHM, via email <br />Ross Gubka, NHM via FedEx & email <br />