Laserfiche WebLink
Page 2 of 2 <br />3) The location of the sump water injection hole on the submitted General Facilities Map- Drawing <br />2.05 -M1 is 3/16" (18.75 feet in map scale) northeast of the currently approved version of the <br />same map. Please verify the correct location of the sump water injection hole on the map. <br />4) The proposed disturbance boundary on the submitted maps is re -drawn to exclude the new <br />generating sub - station. This change in disturbed acreage is not reflected on the revision <br />application form. A revised application form will need to be re- submitted to show the small <br />reduction in disturbed acreage. <br />5) As requested in Ms. Pineda's November 29, 2012 letter, DRMS respectfully requests that <br />regulatory authorities for the methane gas electricity facility be identified and documented in <br />the Elk Creek permit. This will assure that there are clear lines of distinction in terms of <br />authority over worker safety, operational and environmental protection at this facility. This <br />will also facilitate better communication for future sites and facility construction. <br />If you have any questions, please contact me. <br />Sincerely, <br />A,A,L,L <br />Brock Bowles <br />Environmental Protection Specialist <br />